Description
Features
BER Details
Show more...
Beds | |
Price | Sale Agreed |
Property Type | Development Land |
Size | 307 meters2 |
Energy Rating | BER-Exempt |
Refreshed on | |
Eircode |
Description
No. 1 - 3 Thomas Court is positioned just of Thomas Street, in the historic core of Dublin City Centre. The site is adjacent to the Digital Hub Campus, which has been home to the largest cluster of technology, digital media and internet companies in Ireland. It is also adjacent to the world renowned St James Gate Brewery and Guinness Enterprise Centre. Diageo will also unveil the new Roe & Co Whiskey Distillery in the former power station building on James Street. Christchurch Cathedral is approximately 750 meters to the east and the property is approximately 1.5 km west of St. Stephen's Green. The property is approximately 350 metres from the National College of Art & Design and 450 metres east of the entrance to St. James Hospital, one of the largest hospitals in Ireland. The construction of the National Children Hospital is currently underway and is due for completion 2022. The location is excellently served by public transport, being close to the Luas Stop (Red Line) at the entrance to St. James Hospital and only approximately 650 metres from Heuston Mainline Train Station and Luas Stop. There are numerous bus routes running along Thomas Street. The N4 Dublin-Galway Road and the N7 Dublin-Cork / Limerick are a short distance. The site has a stated area of 307 m2 . The proposed development is a total of 1198 sqm including basement Site comes with full planning permission to construct a new 4 storey over basement office building with a setback fourth floor with main entrance on Thomas Court. The site currently consists of a number of light buildings and over grown shrubbery. The site is bounded to the north by an existing public house Arthurs, which is three-storey onto Thomas Street and two storey onto Thomas Court. Zoning Z5 - 'to consolidate and facilitate the development of the central area, and to identify, reinforce and strengthen and protect its civic design character and dignity Floor Areas Office Basement 2,647 Office Ground 2,669 Office First 2,701 Office Second 2,701 Office Third 2,228 Total 12,946 sq ft
Features
FPP for Impressive office accommodation of 1,198 sq.m. Four floors over basement Strategic location adjacent to The Digital Hub and the Children€TM Hospital Luas Red Line St James Stop (3 minute walk) Heuston Mainline Train (10 minute walk) St. Stephen€TM Green (20 minute walk)
BER Details
BER: Exempt
Date created: Jul 15, 2019