Killeigh Clonmel Road, Cahir, Tipperary

€295,000 Energy Rating3 beds3 baths103 m2
Save
Print
Share

Description

We are delighted to bring to the market this exclusive New Development of only no. 8 Semi Detached family homes. This development will be starting September 2023 and is within 5 minutes walk from Cahir town centre, shops, schools and may amenities this heritage town has to offer. ** Please note this development has Part V exemption certificate and is exempt from any social or affordable housing** The houses will be constructed using ICF Construction (Insulation Concrete Formwork) Each house will be connected to public sewers and mains water supply on the site. The houses will be built in accordance with current building regulation and will comply with planning condition referenced to the development. The houses will be registered with Homebond. Specifications: Main Build • ICF Construction. • Truss Roof covered with black tiles. • White Passive uPVC windows & Doors double glazed. • White acrylic exterior finish. • Black uPVC fascia, soffit & Gutters. • The internal wall surfaces will be covered with Gyproc plaster board with Skim plaster finish. • The stairs will be white deal. • Regency type pre-hung internal doors. • White skirtings and architrave’s throughout. • Spray painted neutral colour throughout. Heating & Plumbing: • Air to Water will be the main source of heating with heat pump located outside. • Radiators sizes to every room controlled by room stats. • 300-liter hot water cylinder located where suitable. • Mechanical extract ventilation in all wet rooms and kitchen. • Standard sanitary ware throughout. Electrical: • 20 double sockets. • Two internet points. • Three TV points. • Standard lighted throughout. • Two exterior lights. • Cooker, dishwasher, washing machine, Fridge and hob points. • One External Car Charging point. • Electrical supply connected. Each house will have its own independent garden and will be fenced with timber post and panel fencing, the lawns will be laid and seeded on completion. One meter wide footpath around each house with tarmac driveways. The site development works will be completed to comply with all condition of the planning associated with the development such as footpaths, roads, street lighting, green areas and site boundaries. Start date Mid-September 2023 Completion Date June 2024. Please call 085 1197 007 for more details, or call into the office for a chat.

BER Details

BER: A2
Show more...
Property Services
Find Property Conveyancing Solicitors, BER Assessors, Pre-Purchase Surveyors and Land Registry Surveyors competing for your business.
Mortgage calculator
Calculate the mortgage required for this property
Price Changes in Cahir
Property Price Register in Cahir
€15,000 (5.08%)
€295,000 €310,000
1st Apr 24
EXEMPT
€5,000 (2.00%)
€250,000 €255,000
25th Mar 24
C3
-€10,000 (-15.38%)
€65,000 €55,000
7th Mar 24
View All Price Changes
Price Changes In Cahir
Property Price Register
Tom O'Brien Estate Agents, Valuer & Auctioneer
Tom O'Brien Estate Agents, Valuer & Auctioneer
PSRA Licence No. 004075

Date created: Jul 25, 2023